2008 Case StudiesSeptember 30, 2008Carrier triumph at the Beijing Olympics Carrier Corporation secured 70% of the HVAC projects awarded at the Beijing Olympics, 2008. Each chosen Carrier product reflects a combination of technical perfection, environmentally sound...
Carrier Gets Gold at the Athens Olympics World Leading Air Conditioning manufacturer, Carrier chosen to supply and service 635 chillers at the Athens Olympic Games in 2004. With its unparalleled range of products, all operating on...
Carrier excels at London’s O2 Arena First the Millennium Dome and more recently the O2 Arena, Carrier has supplied air conditioning for both.
Carrier ‘drops in’ roof-top replacement for Tesco Several Tesco stores across the south of England have benefited from Carrier’s roof-top units.
It’s not just refrigerant that is replaced with ‘drop-ins’ these days. Thanks to Carrier’s...
|
|
